Work Programme -
Overview
Overview
of project work packages and planning
Phase 1:
Preparation and Networking (start at month 1 ends with
month 6):
-
The
start of the project is also the start of the
development of the bio-fuels networks and the
thematic groups for partners and other actors. At
this stage, training materials and the best practice
network tools will be developed for internal and
external communication and networking. The official
project implementation agreements are made at the
Kick-off meeting on the first month with all project
partners.
-
In
order to make the required formal agreements, a
partnership will be made between the participating
partner with the farmers and the local authorities.
The formal agreement with the 5 public authorities
involved with managing transport fleets and 2
bio-fuels suppliers will be made by every partner.
A plan will be agreed upon for the local/regional
implementation of a bio-fuel use project based on
the networks of the Bio-NETT project with content,
tools and methodology. Each partner would set up a
regional steering committee that will ensure an
advisory role.
-
Agreement will be reached upon the evaluation of the
actual project outputs, the collection of transport
energy consumption values and the production of user
profiles. There will be a gathering of transport
energy consumption data and the user behaviour under
the responsibility of the energy agency partner.
-
Before
the awareness training courses and the
implementation of the local bio-fuels project take
place, the project shall be discussed with the
users/producers in the networking meetings to build
confidence and agree upon a governance framework for
the project. The content of the training courses
will be discussed and agreed upon with the actors at
the Network meetings and thematic groups before the
introduction of the training courses. Each partner
will set up the pre-evaluation in his area/region,
through the consultation of the local project
steering committee. There will be at least 2
exchange meetings between neighbouring partner
network groups, nationally and/or internationally.
Phase 2:
Development (start at month 7 ends with month 12):
-
The
training plans shall make a link between barriers to
bio-fuels production with the calculated energy
characteristic values for the transport energy
consumption of public authorities. Training plans
would also take into consideration the scope for
preparing improved transport plans and transport
optimization possibilities. Best Practice tools,
gained from the network meetings and thematic groups
would be used as teaching materials for the training
and awareness courses. Energy Agencies and other
partners would also enhance their bio-fuels in use
knowledge and consciousness.
-
The
training courses would be carried out in two levels.
(1)
Training for partners by specialist sub-contractors
(2)
Training of local actors by Partners, to be attended
by actors and would include discussions on
production methods, energy and environmental issues,
followed by workshops and exercises and cross border
observations.
Phase 3:
Implementation (start at month 13 ends with month 17):
-
During
this phase the participant Local Authorities will be
monitored by the project partners in terms of the
scope for implementing a bio-fuels use project,
offering practical help and information. The network
tools will be further developed and adapted on the
basis of the needs and evaluation of them in the
training sessions as a feedback mechanism for the
project. The steering group will be involved with
the evaluation of the benefits of the training
courses on the implementation of local bio-fuels in
use projects.
-
This
phase also envisages the start of the practical
implementation of at least 2 bio fuels project in
each partner region as a consequence of the local
bio-fuels networks that have been developed. The
Partners shall work closely with Local Authorities
and other Public Sector organisations to implement a
sustainable bio-fuels in use project which will
involve at least 10000 vehicle miles per annum on a
local basis.
Phase 4:
Dissemination (start at month 18 ends with month 30):
-
During
this phase there will be an open workshop about the
use of the tools and the materials developed for the
training courses with participation of the
key-persons (dissemination) and other bio-fuels
supply chain actors, schools and energy agencies
nationally. The participation of representatives of
the steering committees or other public sector
organisations is also considered crucial.
-
During the final Workshop and the national Workshops
the project experience shall be evaluated and
products presented. The relevant educational
material is put at the disposal of other interested
organisations.